Performed Project:
CVG International, Miami

Project Description Manufacturer Year
Supply of 5000 Cu-Ni alloy finned tubes, 1 "dia., For replacement in the water circulation coolers of the hydraulic generators of the Macagua Dam, San Félix dam, Bolívar State. TEXFIN 2005
Supply of 36 cooling modules with finned steel-titanium alloy tubes, (resistant to the abrasion of the sands of the river), for hydraulic generators of the Guri Dam. Bolivar State, Venezuela. TEXFIN 2005
Supply of one horizontal hydraulic press of 300 tons, for the insertion of steel wheels to shaft, used for mineral haulage cars. Puerto Ordaz, Bolivar State, Venezuela. SAVAGE 2005

Miami, USA

2665 South Bayshore Dr.
Suite 602
Miami Fl. 33133
Phone: +1 (786) 735 5129
Fax: +1 (786) 472 8789

BVI

Trident Chambers, Wickham's Bay Road Town, Tortola, British Virgin Island.
Phone: +1 7867354854
Rotterdam, Holland

The Mark,
Fascinatio Blvd 216-200
Rotterdam 3065 WB
The Netherlands
Phone: +31 10 798 2457

MAQUINDUS All rights reserved, 2018