• 1995- ARMADA de VENEZUELA . The ANGU Naval Station was facing constant failures and interruptions in the supply of electric power which fed the population of Puerto Hierro, State of Sucre. Maquindus Supplied and Installed a CUMMINS Diesel Electric Power Plant for Heavy Duty Service (ongoing) and 810 Kw Self-Generation

• 1995- ARMADA DE VENEZUELA . The infrastructure of the Base ANGU’s dock, located in the State of Sucre , is where the frigates of the Venezuelan Armed Forces are brought in for required maintenance and support. Maquindus, C.A., was contracted to Supply and Install a CUMMINS Diesel 300Kw Emergency Electric Power Plant. The selection of this equipment was the best option for the Armed Forces as this is an area of heavy activity and environment.